Warehouse Relocation Services in Jenks, OK
A warehouse relocation in Jenks needs a working plan for the rack you own, the inventory it holds and the building receiving it. Tulsa Pallet Rack starts by comparing those three pieces. Moving steel without checking beam elevations, aisle space and receiving access can leave usable material waiting on the floor.
Our rack relocation work covers dismantling existing bays, sorting components, arranging transportation and rebuilding the system around the destination layout. We identify damaged pieces before they enter the next installation and determine where additional material is needed. Tulsa Pallet Rack is a division of Warehouse Equipment & Supplies Co., a company that has supplied and installed rack since 1997.
Warehouse relocation built around outbound orders
The move should follow the shipping operation, not force every department into the same shutdown. We review which products can move early, which picking positions must remain available and whether an initial rack area can be installed before the main transfer. That discussion establishes practical boundaries for each phase.
Existing rack also deserves a condition review before anyone assumes every bay will travel. Bent braces, distorted beams, damaged connectors and missing hardware need attention. Separating reusable material from replacement needs gives purchasing and operations a clearer picture while there is still time to adjust the plan.


Operations We Rack Around Here
For Jenks building-materials and grocery distribution operations using the US-75 and US-64 corridors, receiving windows help determine truck loading and installation sequence.
Rack relocation from survey through installation
Each phase needs a defined handoff. Inventory clearance, crew access, loading space and the receiving area should be agreed upon before steel is handled. The sequence below connects the physical work to those operating decisions.
Map the receiving layout
Measure the destination, record column locations and compare available height with existing frames. Prepare layout drawings showing aisles, beam levels and rack quantities so the move begins with a defined installation plan rather than a rough bay count.
Unload and dismantle bays
After your team clears the assigned inventory, crews remove decking, beams and frames in a controlled sequence. Components are checked, labeled and grouped by size and destination zone, with suspect pieces separated for review.
Bundle for the trip
Organize bundles around the unloading and rebuilding sequence. Keep connectors and small hardware identified, protect loose components and coordinate truck access so receiving crews can locate the material needed for the first installation area.
Rebuild the planned zones
Install the accepted components to the destination drawings, checking alignment, connections and specified anchoring. Review beam elevations against actual pallet loads, then keep inventory out until the assigned rack area is ready for use.
Pallet rack relocation decisions worth settling early
A different building can change the usefulness of otherwise sound rack. Clear height, column spacing and door positions may require shorter runs, revised aisles or different beam elevations. Drawings should resolve those conflicts before bundles reach the receiving dock.
When you relocate only part of the system first, the remaining bays must still support daily orders. We discuss inventory consolidation and access with your team so dismantling does not remove the last available location for active products.
Added rack must be evaluated for compatibility, dimensions and intended loads. Similar-looking connectors are not enough. Where a direct match cannot be established, a separate new run may make more sense than mixing uncertain components into an existing bay.
Summer heat in non-air-conditioned buildings affects crew pacing and staging space. For moves using the southern corridors, we also discuss alternate loading windows when severe spring weather or winter ice interrupts travel. The schedule needs room for those decisions.
Recent Installations
Racking projects completed for warehouses across the Tulsa metro and northeastern Oklahoma.










Put the Jenks move on paper
Call (918) 296-8162 with both building addresses, rack photographs, approximate quantities and your shipping constraints. We can identify the measurements and condition checks needed to develop a useful scope. Call (918) 296-8162.
Tulsa Pallet Rack
3171 S 129th E Ave.
Ste A #5316
Tulsa, OK 74134
(918) 296-8162Monday - Friday: 8:00 AM - 6:00 PM
Jenks rack moving questions
Other Rack Types We Supply in Jenks

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Deep storage lanes for bulk inventory, with access aisles around the rack block.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers the Tulsa metro and northeastern Oklahoma, with project scope and timing agreed for each building.
Where We Work
Located in Tulsa, we serve the entire Tulsa metro with industrial pallet racks and warehouse storage solutions.
Tulsa Pallet Rack
Address
3171 S 129th E Ave.
Ste A #5316
Tulsa, OK 74134
Phone
(918) 296-8162Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Warehouse Relocation in Jenks?
Call (918) 296-8162 or request a quote and we will get a layout started.