
Warehouse Relocation Services in Broken Arrow, OK
For warehouse relocation in Broken Arrow, the first practical question is what must keep shipping while the rack moves. We work backward from that requirement to establish inventory clearance, usable staging space and the order of installation at the destination. Moving steel is only one part of transferring a working storage operation.
As a division of Warehouse Equipment & Supplies Co., Tulsa Pallet Rack has been supplying and installing since 1997. We approach rack relocation by checking what you own, what can be reused and what the next building requires. A measured plan is more useful than assuming every existing bay should return in its former position.
Pallet rack relocation starts with fit
Older Broken Arrow manufacturing and warehouse buildings may have 18–24 ft clear heights. A move from a taller building can leave upright heights or upper storage levels unsuitable for the destination. Compare actual dimensions before assigning components to the new drawing.
Column spacing and door locations can break up a long rack run that worked well elsewhere. We account for those fixed features, along with pallet depth and forklift maneuvering space, when preparing the proposed layout. Reusing material does not require repeating an awkward arrangement.
Inspect frames, beam connectors, bracing and decking as part of the reuse decision. Bent or otherwise damaged pieces should be isolated and reviewed, not mixed into the next installation. Replacement quantities need to be visible before the crew reaches the affected phase.
Additional bays may help establish destination storage before the existing rack arrives. Where new and moved material meet, check the actual connection system and intended loads. Parts that appear similar should not be treated as interchangeable without confirmation.
Warehouse relocation without one large shutdown
A staged transfer gives your warehouse team smaller, clearer inventory tasks. Empty a defined group of bays, move that material and release the rebuilt area before proceeding to the next group. This approach requires enough working room at both addresses; it should be planned rather than promised without examining the operation.
For movements toward Coweta or Wagoner, consider how the Creek and Muskogee Turnpikes fit the actual pickup and delivery addresses. The important scheduling issue is matching trucks to clear loading areas and available crews. Sending material early serves little purpose if the receiving floor is still occupied.


Operations We Rack Around Here
For metal fabrication and auto/truck parts distribution around Broken Arrow and the SH-51 Broken Arrow Expressway, move phases should preserve access to production stock and outgoing orders.
Four handoffs in rack relocation
The cards below describe the main work packages, beginning with the receiving-building decisions. Final sequencing follows the agreed move plan, with inventory clearance and component availability checked before each work area changes hands.
Map bays to the new floor
Record rack dimensions and available component information, then develop destination drawings around storage needs. Assign each reusable group to a planned position. Establish where temporary inventory, incoming bundles and replacement material will stand while work proceeds.
Prepare the installation sequence
Define which rows will be rebuilt first and what material each requires. Reinstall frames, beams and accessories to the reviewed arrangement after delivery. Check the assembled work before the warehouse team begins returning pallets to those locations.
Release and dismantle sections
Once your team has emptied a scheduled block, remove its components in an organized order. Maintain identification through teardown and separate damaged material. Keep neighboring storage and travel routes outside the dismantling area available only as the work plan allows.
Load by receiving phase
Bundle compatible components and label them for the destination area. Arrange loads so the next installation phase can be unloaded without sorting every bundle. Confirm truck access and available floor space before releasing material from the original building.
Recent Installations
Racking projects completed for warehouses across the Tulsa metro and northeastern Oklahoma.










Discuss your Broken Arrow transfer
For a useful scope review, provide both building addresses, rack photos, a rough component count and the dates when inventory can be cleared. Explain which shipping activities must continue. Reach our rack relocation team at (918) 296-8162. Call (918) 296-8162.
Tulsa Pallet Rack
3171 S 129th E Ave.
Ste A #5316
Tulsa, OK 74134
(918) 296-8162Monday - Friday: 8:00 AM - 6:00 PM
Questions before the first bay moves
Other Rack Types We Supply in Broken Arrow

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Deep storage lanes for bulk inventory, with access aisles around the rack block.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers the Tulsa metro and northeastern Oklahoma, with project scope and timing agreed for each building.
Where We Work
Located in Tulsa, we serve the entire Tulsa metro with industrial pallet racks and warehouse storage solutions.
Tulsa Pallet Rack
Address
3171 S 129th E Ave.
Ste A #5316
Tulsa, OK 74134
Phone
(918) 296-8162Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Warehouse Relocation in Broken Arrow?
Call (918) 296-8162 or request a quote and we will get a layout started.