
Warehouse Relocation Services in Tulsa, OK
A warehouse relocation in Tulsa should begin with the destination layout, not with a crew pulling beams. We compare your existing rack with the receiving building, identify material worth moving, and establish which inventory must remain accessible. That gives you a working sequence for dismantling, hauling and rebuilding without treating the entire warehouse as one shutdown.
Tulsa Pallet Rack is a division of Warehouse Equipment & Supplies Co., supplying and installing since 1997. Our rack relocation work accounts for upright heights, beam lengths, pallet weights and daily shipping demands. The goal is to reuse suitable material while correcting layout problems that would otherwise follow you into the next building.
Warehouse relocation built around shipping
Start by identifying the orders, products and storage positions that cannot go offline together. A phased move may transfer one rack block, establish usable storage at the destination, then release the next block. The right sequence depends on available floor space, inventory clearance and how much receiving work continues during the transition.
Moving between a north Tulsa bulk distribution building and an older West Tulsa warehouse calls for more than repeating the existing rows. Clear height, column locations, doors and forklift turning space can change the arrangement. We prepare destination drawings before teardown so the crew knows which components belong in each planned rack run.


Operations We Rack Around Here
Around Tulsa International Airport and North Mingo Industrial Park, aviation parts operations and bulk distribution buildings need receiving space and shipping access protected throughout the move.
Rack relocation from survey to installation
Each stage needs a defined handoff. Your team clears merchandise and confirms access; our scope establishes how the rack is taken apart, identified, transported and assembled. Keeping those responsibilities visible reduces confusion when both buildings are active.
Plan the receiving layout
Document existing components, pallet sizes and operating loads, then draw the destination arrangement. Confirm row lengths, beam elevations and staging areas before assigning move phases. Flag missing information early rather than assuming the old configuration fits the new floor.
Dismantle cleared rack blocks
After inventory is removed, take down decking, beams and frames in a controlled sequence. Inspect exposed components for bent steel, damaged connectors and missing hardware. Separate questionable pieces from material intended for reuse so they cannot enter a shipping bundle unnoticed.
Bundle and move identified material
Group components by type and destination phase, with labels that remain readable during handling. Coordinate loading access and unloading space at both addresses. A well-organized load keeps the installation crew from searching through unrelated material for the next row.
Rebuild against the drawing
Set the rack in its assigned positions and install the specified beams, decking and connection hardware. Check alignment and the assembled configuration before storage resumes. Keep replacement parts separate until their intended locations and compatibility have been confirmed.
Pallet rack relocation details worth resolving
Existing rack is not automatically suitable for every new application. Changing beam elevations or pallet loads can affect the usable configuration. Gather available component identification and capacity information before deciding which rows can be reused as drawn.
When additional storage is needed, we review new rack alongside the relocated material. Similar color or beam length does not establish compatibility. Connection style, frame dimensions and intended loading all need attention before combining components.
For buildings reached by US-169 or I-244, coordinate truck arrivals with actual dock availability rather than simply dispatching every load together. Reserve a receiving zone that does not block outbound freight or become mixed with saleable inventory.
Hot, humid conditions in non-air-conditioned buildings affect crew pacing and staging choices. Spring severe weather and occasional winter ice also belong in the schedule discussion. Establish who communicates changes and which tasks can shift without disrupting the whole move.
Recent Installations
Racking projects completed for warehouses across the Tulsa metro and northeastern Oklahoma.










Get a Tulsa rack move scoped
Send both addresses, rack photographs, approximate frame and beam counts, and your preferred transition sequence. Include any layout drawing and identify inventory that must remain available. Call (918) 296-8162 to discuss the scope. Call (918) 296-8162.
Tulsa Pallet Rack
3171 S 129th E Ave.
Ste A #5316
Tulsa, OK 74134
(918) 296-8162Monday - Friday: 8:00 AM - 6:00 PM
Tulsa moving questions
Other Rack Types We Supply in Tulsa

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Deep storage lanes for bulk inventory, with access aisles around the rack block.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers the Tulsa metro and northeastern Oklahoma, with project scope and timing agreed for each building.
Where We Work
Located in Tulsa, we serve the entire Tulsa metro with industrial pallet racks and warehouse storage solutions.
Tulsa Pallet Rack
Address
3171 S 129th E Ave.
Ste A #5316
Tulsa, OK 74134
Phone
(918) 296-8162Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Warehouse Relocation in Tulsa?
Call (918) 296-8162 or request a quote and we will get a layout started.